Lawley Medical Practice

Project Description:

 

Construction of a new Medical Centre which included; Doctors Consulting rooms, Dentist, Reception, Toilets and Admin Offices. The project involved extensive ground works to cap existing mine shafts present on the site before the main building work could commence. The construction consists of a reinforced concrete raft foundations, brick cavity external walls, pre-stressed concrete plank floors at first floor level and a timber truss roof. AMG had to work closely with the Medical Centres specialist equipment suppliers and the M&E Contractors to ensure co-ordination of services.

Project Value: £760,000

Project Duration: 32weeks

Form of Contract: JCT Intermediate Form of Building Contract

Client: Dr Pringle

Architect: Gould Singleton

Structural Engineer: SM Structural Engineering Services

QS: Carl Dean Associates

M&E Consultants: MIA

Tendered/Negotiated/Framework: Tendered

 

 

Higford Hall

Project Description:

 

Having previously completed the building of a new Stable Block and Barn for Young Options on their site at Higford, we were approached by the Chairman of the Options Group to negotiate and assist with the design and development of a new residential and educational facility for autistic children and children with challenging behaviour on the site of the former Higford Hall which had burned down some years earlier.

Working in collaboration with the Client and our supply chain AMG developed a 3 phase scheme that would enable partial occupation of the building in line with Options Group’s Business Plan. The first phase was the rebuild of Higford Hall which houses the centres; Reception, Training Rooms, Offices, Medical Room, Kitchen and an 8 bedroom single storey residential wing to the rear of the Main Hall that also includes a central courtyard which has covered with a patent glazed roof to provide a secure play area. The white rendered building was designed to fit in with the existing buildings on the site and to replicate the style of the original hall. The second phase was the construction of a 10 bedroom residential block built in a similar style to the main hall and a separate steel framed therapy barn which included the latest technology in interactive equipment. The final stage was the construction of a glazed walkway to link all the schools facilities and provide igloo type pods that house interactive floor sensors that when pressed sprays the pods with jets of water

 

Project Value: £4.6 million

Project Duration: 52 weeks

Form of Contract: JCT

Client: Options Group

Architect: A C Craig Associates

Structural Engineer: Central Design Practice

QS: Alsebrook & Hadley

M&E Consultants: Contractor Design Elements

Tendered/Negotiated/Framework: Negotiated

 

More projects

Mayfield Medical Centre

Project Description:

 

The construction of a new NHS Medical Centre which comprised of; Doctor’s Surgery, Dentist, Pharmacy, Waiting Rooms, Admin Offices etc. The construction consisted of reinforced strip foundations with cast in situ floor slab, cavity external walls, beam and block suspended floor to the 2 storey entrance and a timber truss roof. AMG had to work closely with the Medical Centres specialist equipment suppliers and the M&E Contractors to ensure coordination of all services.

Project Value: £1.1 million

Project Duration: 42 weeks

Form of Contract: JCT Form of Building Contract

Client: Premier Medical Ltd

Architect: Gould Singleton

Structural Engineer: S M Structural Engineering Services

QS: Derek Evans Partnership

M&E Consultants: Contractor Design

Tendered/Negotiated/Framework: Tendered

 

Birmingham Children’s Hospital – Paediatric Intensive Care Unit

Project Description:

 

Refurbishment and extension of the Paediatric Intensive Care Unit to create additional ward, new reception, offices and family accommodation. The project included significant structural alterations and remodelling, installation of high tech specialist medical equipment and interior finishes creating a child friendly environment.

Project Value: £2.4 million

Project Duration: 30 weeks

Form of Contract: JCT

Client: Birmingham Children’s Hospital

Architect: Horsley Huber Architects Ltd

QS: Fred Taylor Consultancy

M&E Consultants: Couch Perry Wilkes

Tendered/Negotiated/Framework: Tendered

 

More projects

Hybrid Theatre Heartlands Hospital

Project Description:

 

The project involved the construction and commissioning of a Hybrid Theatre and associated rooms complete with all services, fixtures, fittings and finishes including the installation of Specialist Laser and Robotic Theatre Equipment.

The structure of the building was a 2 storey steel frame, the ground floor being the Plant Room including ventilation, air conditioning, IPS and UPS equipment all to serve the Theatre at first floor level with break through connections to the existing Theatre Suite.

Project Value: £2.4 million

Project Duration: 42 weeks

Client: Heart of England NHS Foundation Trust

Architect: Horsley Huber Architects Ltd

QS: Holbrow Brookes

M&E Consultants: Stewart Associates

Tendered/Negotiated/Framework: Tendered

 